The proposed staging plans for the development are as follows:

  • The staging of the development is described in the Consent (SSD8660) and the EIS. The site will be fully constructed prior to commencement of operations.
  • The following works / approvals are required:
    • Installation of a second weighbridge is to occur once the site reaches 100,000 tonne per annum capacity;
    • Stage 1 operations: DPE approval is required for the site to increase waste receival and recycling above 100,000 tonnes per annum (Condition A7);
    • Stage 2 operations: A second DPE approval is required for the site to increase waste receival and recycling above 150,000 tonnes per annum (Condition A8) to a maximum of 200,000 tonnes per annum (Condition A6).